PRWeb The Leader Press Release Distribution
See How PRWeb Works

We're here to help 1-866-640-6397

Login Create Free Account


All Press Releases for March 10, 2009 Subscribe to this News Feed    
 

Work Begins on Natoma Pipeline

City of Folsom Water Service to be Interrupted for 24 Hours Beginning 1 a.m. Wednesday, March 11

(Vocus/PRWEB ) March 10, 2009 -- The Bureau of Reclamation has coordinated a planned water service outage with the City of Folsom and Folsom State Prison in order to replace approximately 300 feet of the Natoma pipeline damaged on February 12 and to construct an additional bifurcation for subsequent rerouting of the pipeline in connection with the Joint Federal Project (JFP) at Folsom Dam and Reservoir. The scheduled work will replace the temporary bypass with a 42-inch steel pipeline and restore full capability for water service delivery to the City and Prison.

The Bureau of Reclamation
The Bureau of Reclamation

On March 11 at about 1 a.m., Reclamation will begin draining the 24-inch temporary bypass pipeline. Once drained, contractors (Abide International) will remove the temporary bypass and begin installing the 42-inch replacement pipe. The work is scheduled to be completed by 11 p.m. on March 11. Full water service is expected to be restored by
1 a.m. on March 12.

Despite the water shutoff, the City and the Prison have adequate storage supplies to provide normal water service to their customers during the repair.

The pipeline bifurcation allows Reclamation to proceed on schedule to permanently reroute the pipeline later this year ensuring continued excavation of the JFP auxiliary spillway. The 50-year-old Natoma Pipeline is owned by Reclamation. The JFP is a joint project by Reclamation, the U.S. Army Corps of Engineers, the Sacramento Area Flood Control Agency, and the Central Valley Flood Protection Board (State of California). Once completed, the new auxiliary spillway will provide enhanced flood control protection and dam safety measures for the benefit of downstream and surrounding communities.

For additional information, please contact the Public Affairs Office at 916-978-5100 or ibr2mprpao(at)mp(dot)usbr(dot)gov.


Reclamation is the largest wholesale water supplier and the second largest producer of hydroelectric power in the United States, with operations and facilities in the 17 Western States. Its facilities also provide substantial flood control, recreation, and fish and wildlife benefits. Visit our website at http://www.usbr.gov.

Media Contact: Pete Lucero, 916-978-5100, plucero(at)mp(dot)usbr(dot)gov

###

Post Comment:
Trackback URL: http://www.prweb.com/pingpr.php/U3F1YS1TdW1tLUhvcnItQ3Jhcy1TaW5nLUNvdXAtWmVybw==

Technorati Tags

Bookmark -  Del.icio.us | Furl It | Technorati | Ask | MyWeb | Propeller | Live Bookmarks | Newsvine | TailRank | Reddit | Slashdot | Digg | Stumbleupon | Google Bookmarks | Sphere | Blink It | Spurl


Other Releases by this Member
OPTIONS
Printer Friendly Version
Download PDF Version
Download Reader Version
BlogThis
ShareThis
CONTACT INFORMATION
Pete Lucero
Bureau of Reclamation
916-978-5100
Email us Here
ATTACHED FILES

There are no multimedia files attached to this release. If this is your release, you may add images or other multimedia files through your PRWeb News Management Console.

ABOUT PRESS RELEASES
If you have any questions regarding information in these press releases please contact the company listed in the press release. Please do not contact PRWeb. We will be unable to assist you with your inquiry. PRWeb disclaims any content contained in these release. Our complete disclaimer appears here.
 
Close Move